Propuesta de un plan de mantenimiento preventivo basado en la metodología de las 5Q' S para los equipos de carga del área de empaque de la empresa Cemex - Colombia.
This maintenance proposal is based on the 5Q'S methodology, which was applied to the loading equipment of the packaging area of the Cemex company - Caracolito, Colombia. An initial diagnosis was carried out on the 5 forklifts and 2 skid steer loaders, where it was determined that the main failu...
Saved in:
Main Authors: | Peña Aguirre, Jhon Fredy, Rodriguez Hernandez, Cristian Camilo |
---|---|
Other Authors: | Rico Bemudez, Juan Carlos |
Format: | Trabajo de grado (Pregrado y/o Especialización) |
Language: | spa |
Published: |
Universidad Antonio Nariño
2024
|
Subjects: | |
Online Access: | http://repositorio.uan.edu.co/handle/123456789/9587 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
- Similar Items
-
Plan de mantenimiento preventivo para la empresa astillera Metalmecanicas
By: Acosta Beltrán, Josby Lilley, et al.
Published: (2022) -
Plan de mantenimiento preventivo para los transportadores de rodillos de la sección de empaque NPK en la empresa Yara Colombia S.A. ubicada en la zona industrial de Mamonal en Cartagena de Indias
By: Zuñiga Medrano, José Luis
Published: (2022) -
Optimización del plan de mantenimiento usando la metodología de Mantenimiento centrado en confiabilidad viviente (L-RCM) para los equipos de la flota de tractores orugas de Carbones del Cerrejón Limited
By: Diaz, Henry Alberto
Published: (2021) -
Diseño e implementación de un plan de mantenimiento eficiente para equipos industriales de grado hospitalario en el centro médico valle de Atriz.
By: Benavides Ramos, Michael Favian, et al.
Published: (2024) -
Diseño y ejecución de plan de mantenimiento preventivo para el sistema de plantas eléctricas en el terminal de transporte de Neiva s.a.
By: Barón Valencia, Luis Eduardo
Published: (2023)