Análisis bajo la metodología MCC para mejorar en el corte B de la subestación Sabanalarga 500KV el indicador de disponibilidad

The objective of this work is to analyze the methodological application for the Improvement in the management of assets of the Sabanalarga 500KV substation, specifically in the Central cut of diameter one associated with field 5M010 associated with the identification of a high criticality index in o...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autor principal: Martínez Gutiérrez, Arturo José
Otros Autores: Fábregas, Jonathan
Formato: Trabajo de grado (Pregrado y/o Especialización)
Lenguaje:spa
Publicado: Universidad Antonio Nariño 2023
Materias:
Acceso en línea:http://repositorio.uan.edu.co/handle/123456789/7933
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Descripción
Sumario:The objective of this work is to analyze the methodological application for the Improvement in the management of assets of the Sabanalarga 500KV substation, specifically in the Central cut of diameter one associated with field 5M010 associated with the identification of a high criticality index in order to carry out strategies of improvement. Based on qualitative and descriptive methods, it supports the construction of the Improve ability methodology. This arises from interdisciplinary studies carried out within the organization, studies based on asset management, and Reliability-Based Maintenance and taking into account that the administration and optimization of maintenance plans at ISA INTERCOLOMBIA constitutes one of the fundamental pillars in the management of the assets of the National Transmission System, that is why the early identification and timely intervention of the critical equipment of an electrical substation are essential to guarantee the continuity of the service in the Colombian territory, with this it is possible to obtain as results the improvement in the availability rates, payment for compensations and events in the system. In addition, decision criteria of the tools used to be able to diagnose the type of maintenance and the interventions that are being carried out. It concludes with the correct identification of the Criticality and Improvement Matrix carried out through fundamental inputs such as the statistics and record of failures presented as a result of events or de
  • Editorial
  • CRAI
  • Repositorio
  • Libros