Diseño y Puesta En Marcha De Instalación Eléctrica Para Máquina Hielera AV400CR En Piscícola Berlín

To guarantee the cold chain in the production and transport process of tilapia for the company Piscícola Berlin S . A . S The support and accompaniment of the energy companies A&C ELECTRICIDAD INDUSTRIAL S . A . S and HAGESA GROUP S . A . S was requir ed for the design and implementation of an e...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autor principal: Pérez Jaramillo, Andrew Jordy
Otros Autores: Duran Torrejano, Jenny
Formato: Trabajo de grado (Pregrado y/o Especialización)
Lenguaje:spa
Publicado: Universidad Antonio Nariño 2022
Materias:
Acceso en línea:http://repositorio.uan.edu.co/handle/123456789/6294
https://www.larepublica.co/especiales/estado-de-la-economia-2020/balance-yperspectivas-del-sector-de-generacion-electrica-para-los-proximos-anos-2960063
https://www1.upme.gov.co/PromocionSector/SeccionesInteres/Documents/Boletines/Bol etin_Estadistico_2018.pdf
http://prepaenlineaaliciaaine.blogspot.com/2017/05/cargas-y-campos-electricos.html Colcha Chacón, A. M. (2015). ANÁLISIS TÉCNICO ECONÓMICO PARA LA ELECTRIFICACIÓN DEL RECINTO 10 DE AGOSTO UBICADO EN EL CANTÓN LA TRONCAL, PROVINCIA DEL CAÑAR, UTILIZANDO ENERGÍA CONVENCIONAL TRIFÁSICA.
https://www.foronuclear.org/descubre-la-energia-nuclear/preguntas-y-respuestas/sobredistintas-fuentes-de-energia/que-es-la-electricidad/
https://riunet.upv.es/bitstream/handle/10251/53520/TFG%20Ferran%20Cremades%20G radol%c3%ad_1436215519961934505705600412513.pdf?sequence=2&isAllowed=y
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Descripción
Sumario:To guarantee the cold chain in the production and transport process of tilapia for the company Piscícola Berlin S . A . S The support and accompaniment of the energy companies A&C ELECTRICIDAD INDUSTRIAL S . A . S and HAGESA GROUP S . A . S was requir ed for the design and implementation of an energy system as an account New that guarantees the correct operation of an Ice Machine type AV400CR. The work is based on a correct understanding and implementation of all the parameters, rules and norms that the E RETIE governs and that is required as a requirement for the supply of energy by lectrificadora del Huila (Electro Huila). The total energy demand was calculated from the data related to the location and the intensity of current required together with the knowledge of the operating modes of this equipment. From these data, the necessary power of the power supply, load transformation and the number of elements necessary for an adequate installation, measurement and distribution of energy was obtained.