Diseño e implementación de un ascensor de carga de capacidad de una tonelada para la empresa Cerrejón en faenas mineras
In this project, the design and subsequent construction of a freight elevator essential for the maintenance operations of the Cerrejón Company was carried out, this allowed for analysis of the selection of materials, calculations and required details. The elevator has a capacity of 1000 Kg, with an...
Guardado en:
Autor principal: | |
---|---|
Otros Autores: | |
Formato: | Trabajo de grado (Pregrado y/o Especialización) |
Lenguaje: | spa |
Publicado: |
Universidad Antonio Nariño
2021
|
Materias: | |
Acceso en línea: | http://repositorio.uan.edu.co/handle/123456789/4753 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sumario: | In this project, the design and subsequent construction of a freight elevator essential for the
maintenance operations of the Cerrejón Company was carried out, this allowed for analysis
of the selection of materials, calculations and required details. The elevator has a capacity
of 1000 Kg, with an electric traction system for lifting a transport basket that allows the
correct vertical movement of tools, spare parts and parts for truck maintenance |
---|