Determinación del costo de los servicios prestados por una empresa de Construcciones e Ingeniería Eléctrica bajo la metodología ABC en el municipio de Palmira- Valle del Cauca
The purpose of this project is to establish a cost calculation method for an electrical engineering project, using the Activity-Based Costing (ABC) methodology. This approach will allow management to have more detailed control over resource usage and improve efficiency in internal processes.
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Tesis/Trabajo de grado - Monografía - Pregrado |
| Language: | Español |
| Published: |
Universidad Antonio Nariño
2025
|
| Subjects: | |
| Online Access: | https://repositorio.uan.edu.co/handle/123456789/12530 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|