Alternativas para la mitigación de asentamientos diferenciales en el edificio Av. 100 de la ciudad de Bogotá causados por la construcción de edificaciones vecinas.
Within this document an existing problematic is described, the building known as Av 100 locate in Bogotá, building’s bad condition due to differential settlements, related to the public works close to the building, To develop this project a descriptive research about the issue will be done and some...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Trabajo de grado (Pregrado y/o Especialización) |
Language: | spa |
Published: |
Universidad Antonio Nariño
2022
|
Subjects: | |
Online Access: | http://repositorio.uan.edu.co/handle/123456789/7216 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Within this document an existing problematic is described, the building known as Av 100
locate in Bogotá, building’s bad condition due to differential settlements, related to the public
works close to the building, To develop this project a descriptive research about the issue will be
done and some alternatives to relief the differential settlements at Av 100 building, which will be
developed by elaborating a comparison of geotechnical behavior for differential settlements
problems, a historical description of structure foundations of buildings near by other buildings
with differential settlements according to the structural methods of the time, and a comparative
description of the stablished relief alternatives for Av 100 building.
The current investigation was developed by researching and consulting different sources to
generate a qualitative, informative and critical analysis, in order to expose the building’s
problematic currently studied and stablish the possible alternatives which may be efficient to relief
the differential settlements of the building |
---|