Alternativas de Gestión RCD de la construcción de la Vía que comunica a Hidroeléctrica Ituango
A hydroelectric power plant is responsible for converting the power of water into electric energy; in order to take advantage of the power of these, large hydraulic infrastructures are built whose function is to exploit to the maximum the strength of this resource, which is renewable and emission-fr...
Saved in:
Main Author: | Chiquillo Estupiñan, Yineth Bibiana |
---|---|
Other Authors: | Wilson, Rodríguez Calderon |
Format: | Trabajo de grado (Pregrado y/o Especialización) |
Language: | spa |
Published: |
Universidad Antonio Nariño
2022
|
Subjects: | |
Online Access: | http://repositorio.uan.edu.co/handle/123456789/6350 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
- Similar Items
-
Estudio térmico de alternativa de ladrillo no estructural basado en los residuos de construcción y demolición (RCD). Zona de la Samaria de Ibagué Tolima
By: Murillas Vargas, Johan Sebastián
Published: (2023) -
Alternativas dentro de la economía circular para el aprovechamiento de los residuos de construcción y demolición (RCD)
By: Oliveros Sánchez, Luisa Fernanda
Published: (2021) -
Aprovechamiento de Residuos de Construcción y Demolición (RCD) y residuos de hojas de maíz en la fabricación de eco-concretos. Caso de estudio Neiva
By: Ramos Páez, María Paula
Published: (2022) -
Análisis y diseño de planes de mejora para los estándares ambientales de la empresa Arquitectura y Concreto S.A.S.
By: Sepulveda Ríos, Carlos Andrés
Published: (2021) -
Estrategias De Mitigación De Residuos De Construcción En Neiva Planta De Reciclaje De Residuos De Construcción Y Demolición En Neiva
By: Herrera Pérez, Gustavo Adolfo
Published: (2022)